• Slider Banner

    ASNR publishes its ASNR 2025 Barometer on the perception of risks by the French.

    Read more
  • Slider Banner

    The Contribution of RATEN ICN to Material Testing within WP2 of the H2020 ECC-SMART Project

    Read more
  • Slider Banner

    The actual priority of SURO in nuclear safety & R&D activities

    Read more
  • Slider Banner

    FIGARO Project: A New Milestone Reached at the Annual Meeting in Cadarache

    Read more
  • Slider Banner

    Integrated Safety Assessment of TRIGA Pitesti Research Reactor by IAEA

    Read more

News from ETSON and its members*

17 Aug 2020 | GRS

In a recent virtual workshop of the European Technical Safety Organisations Network (ETSON), nuclear safety experts of the network´s member organisations explored the consequences of the current Covid-19 pandemic for nuclear safety and discussed respective countermeasures.

30 Apr 2020 | ENEA

PERSEO is a full scale facility aimed at studying a new passive decay heat removal system operating in natural circulation.

30 Apr 2020 | ENEA

Unexpected methane and CO2 releases from the ground and noble and conventional gases in groundwater could be favored by stress produced by geological and seismic phenomena.

30 Apr 2020 | ENEA

SIET S.p.A. is a small joint-stock company with public and private capital, ENEA is the main shareholder.

30 Apr 2020 | ENEA

Thanks to funding from the Emilia Romagna Region, a new Science Park is under development in the outskirts of Bologna to host several scientific and technological agencies and institutions of national and international relevance.

16 Jan 2020 | NRA

The seawall is one of the main coastal protection structures against tsunamis. Estimating tsunami wave pressures on a structure is quite important when designing seawalls.

16 Jan 2020 | NRA

Uranium is an important nuclear material and contaminant with respect to the sites of uranium mining and whole nuclear facilities.

16 Jan 2020 | NRA

The regulatory guide for reviewing the licensee's technical report for the extension of the operating period of commercial power reactors, enacted in November 2013, requires evaluation of the proof stress of the concrete structures of nuclear power plants operated for more than 40 years if the neutron fluence exceeds or may exceed a certain limit where neutron irradiation affects the concrete strength.

16 Jan 2019 | NRA

A new risk-informed and performance-based inspection program will be enacted from April 2020. A part of this program builds on the information obtained from a probabilistic risk assessment (PRA).

 

 

* The responsibility for the content of news provided by ETSON member organisation lies solely with the respective ETSON member. The views and opinions expressed in news content provided by ETSON member organisations do not necessarily reflect those of ETSON.

 

Stay informed - subscribe to our newsletter.

Stay informed - subscribe to our newsletter.
The subscriber's email address.