• Slider Banner

    New ETSON Technical Report on PSA

    Read more
  • Slider Banner

    Full System Decontamination of the primary circuit at Tihange 2 NPP: safety assessment by Bel V

    Read more
  • Slider Banner

    Assesing the Role of Nuclear Energy in the Energy Transition: Sustainability, Perfomance and Future Challenges

    Read more
  • Slider Banner

    Electrical insulation performance of cables with thermoplastic

    Read more
  • Slider Banner

    IAEA International Conference - Technical and Scientific Support Organizations (TSOs)

    Read more
  • Slider Banner

    Strengthening the Organizational Capabilities for Future Radiation Protection Investigations

    Read more
  • Slider Banner

    Biofilm Formation and the Establishment of Anaerobic Environment on Excavation Damaged Zone Fractures

    Read more
  • Slider Banner

    Estimation of Vibration Characteristics of Nuclear Facilities Based on Seismic Observation Records

    Read more

News from ETSON and its members*

30 Apr 2020 | ENEA

Unexpected methane and CO2 releases from the ground and noble and conventional gases in groundwater could be favored by stress produced by geological and seismic phenomena.

30 Apr 2020 | ENEA

SIET S.p.A. is a small joint-stock company with public and private capital, ENEA is the main shareholder.

30 Apr 2020 | ENEA

Thanks to funding from the Emilia Romagna Region, a new Science Park is under development in the outskirts of Bologna to host several scientific and technological agencies and institutions of national and international relevance.

16 Jan 2020 | NRA

The seawall is one of the main coastal protection structures against tsunamis. Estimating tsunami wave pressures on a structure is quite important when designing seawalls.

16 Jan 2020 | NRA

Uranium is an important nuclear material and contaminant with respect to the sites of uranium mining and whole nuclear facilities.

16 Jan 2020 | NRA

The regulatory guide for reviewing the licensee's technical report for the extension of the operating period of commercial power reactors, enacted in November 2013, requires evaluation of the proof stress of the concrete structures of nuclear power plants operated for more than 40 years if the neutron fluence exceeds or may exceed a certain limit where neutron irradiation affects the concrete strength.

16 Jan 2019 | NRA

A new risk-informed and performance-based inspection program will be enacted from April 2020. A part of this program builds on the information obtained from a probabilistic risk assessment (PRA).

 

 

* The responsibility for the content of news provided by ETSON member organisation lies solely with the respective ETSON member. The views and opinions expressed in news content provided by ETSON member organisations do not necessarily reflect those of ETSON.

 

Stay informed - subscribe to our newsletter.

Stay informed - subscribe to our newsletter.
The subscriber's email address.