• Slider Banner

    ASNR publishes its ASNR 2025 Barometer on the perception of risks by the French.

    Read more
  • Slider Banner

    The Contribution of RATEN ICN to Material Testing within WP2 of the H2020 ECC-SMART Project

    Read more
  • Slider Banner

    The actual priority of SURO in nuclear safety & R&D activities

    Read more
  • Slider Banner

    FIGARO Project: A New Milestone Reached at the Annual Meeting in Cadarache

    Read more
  • Slider Banner

    Integrated Safety Assessment of TRIGA Pitesti Research Reactor by IAEA

    Read more

News from ETSON and its members*

26 Sep 2022 | RATEN ICN

To ensure the structural integrity of components which are on use in nuclear installations, it is necessary to know their resistance to the initiation and propagation of cracks. Because of their dimensions it is a quite demanding task to prepare the standard fracture mechanics specimens for a classical ASTM test. All the above-mentioned led to the need of introducing a new method for assessing the fracture material properties of tubes with thin walls, called Pin-Loading Test (PLT).

26 Sep 2022 | LEI

In the framework of the Euratom Research and Training Programme, HARMONISE (a project expected to start in mid-2022) will study relevant research and cooperation activities in standardization and nuclear safety considering also the lessons learnt from the stress tests performed in the EU. The project is coordinated by LEI and involves nine ETSON members along with partners representing research organisations, regulators and industry.

26 Sep 2022 | ENEA

Graphite used in nuclear plants must be disposed of properly. Prolonged aging, even at room temperature, can lead to the formation of different species, such as graphite oxide, which has the possibility of being dispersed into the environment much more easily and this entails a risk that must be taken into consideration

26 Sep 2022 | NRA

Clearance measurement should be performed as a conformity assessment of the evaluated contamination values to the regulatory limit, considering the measurement’s uncertainty, including the uncertainty of the ratio of the activity concentration of the difficult to measure nuclide to that of the key nuclide. The key issues for the treatment of these uncertainty were summarized.

26 Sep 2022 | RATEN ICN

Advanced concepts of CANDU fuel bundles with more than 37 elements are analyzed comparatively to the 37-rods standard fuel bundle design from the safety performance point of view.

26 Sep 2022 | LEI

Scientists of Lithuanian Energy Institute have been developing an open-source turbulent combustion solver flameFoam, based on OpenFOAM toolkit. Code to code analysis and comparisons with experiments showed that flameFoam mostly corresponds to the state-of-the-art currently achieved in the field.

26 Sep 2022 | ENEA

Application of statistical non-parametric methods to radioxenon distributions in atmosphere in order to study the atmospheric background fluctuations and the influence of anthropogenic activities.

26 Sep 2022 | NRA

NRA Secretariat experts developed an empirical method for estimating source vicinity ground-motion levels on hard bedrock and annual exceedance probabilities for inland crustal earthquakes with sources difficult to identify in advance.

26 Sep 2022 | LEI

For the examination of plasma and impurity transport in the DT experimental campaign, energy balance, dependency on discharge, and the time evolution of radiation loss profiles are provided by LEI scientists. Indeed, the record braking pulse  is also being analyzed here at LEI.

26 Sep 2022 | ENEA

Safety Analyses of SMR with Passive Mitigation strategies - Severe Accident (SASPAM-SA) project proposal has been submitted and has been founded in HORIZON-EURATOM-2021-NRT-01-01, “Safety of operating nuclear power plants and research reactors”. The project is coordinated by ENEA (Italy) and its key objective  is to investigate the applicability and transfer of the operating large-LWR reactor knowledge and know-how to the near-term deployment of iPWR, in the view of severe accident  and emergency planning zone  European licensing analyses needs.

 

 

* The responsibility for the content of news provided by ETSON member organisation lies solely with the respective ETSON member. The views and opinions expressed in news content provided by ETSON member organisations do not necessarily reflect those of ETSON.

 

Stay informed - subscribe to our newsletter.

Stay informed - subscribe to our newsletter.
The subscriber's email address.