• Slider Banner

    ASNR publishes its ASNR 2025 Barometer on the perception of risks by the French.

    Read more
  • Slider Banner

    The Contribution of RATEN ICN to Material Testing within WP2 of the H2020 ECC-SMART Project

    Read more
  • Slider Banner

    The actual priority of SURO in nuclear safety & R&D activities

    Read more
  • Slider Banner

    FIGARO Project: A New Milestone Reached at the Annual Meeting in Cadarache

    Read more
  • Slider Banner

    Integrated Safety Assessment of TRIGA Pitesti Research Reactor by IAEA

    Read more

News from ETSON and its members*

15 May 2023 | LEI

The DEBORA benchmark is an international programme that aims to find a more unified methodology for testing and validating Computational Multiphase Fluid Dynamics (CMFD) models.

15 May 2023 | PSI

PSI has a unique (worldwide) environment for the investigation of highly radioactive / toxic materials:

  • Materials (different fuel types, very high burn-up, different cladding materials, materials activated in SINQ)
  • the hot lab with advanced tools for microsample analysis and preparation
  • the large-scale equipment for advanced material analysis
15 May 2023 | Bel V

NIRAS/ONDRAF, the Belgian National Agency for Radioactive Waste and Fissile Materials, was granted a license for the construction and exploitation of a Near-Surface Disposal facility for disposal of low and intermediate level short lived radioactive waste. 

15 May 2023 | LEI

EURAD activities cover high priority common interests of different actors involved in safe radioactive waste management. One of the EURAD work packages, WP2 ACED, is devoted to Assessment of Chemical Evolution of ILW and HLW Disposal Cells.

15 May 2023 | PSI

The increasing risk of extended electricity supply disruptions and severe electricity price fluctuations  strongly motivate an evaluation of electricity supply resilience. In this direction, this research proposes a multicriteria decision support framework to assess resilience at a country level, based on three major dimensions: Resist, Restabilize and Recover. In total, 35 European countries are ranked according to their performance on 17 indicators, through a synergy of MCDA methods, techniques and communication protocols. The assessment framework has been extended to incorporate the Choquet Integral method, in order to accommodate potentially interacting pairs of criteria and negate their arbitrary effects on the final evaluation results. The analysis incorporates country data from credible international databases, as well as the preference information of a European energy expert. The results are envisaged to support energy policymakers in Europe and provide guidelines and areas for improvement at a country level.

15 May 2023 | GRS

On 15 April 2023, the last nuclear power plants in Germany will be shut down. This will mark the end of the history of electricity production from nuclear power after more than 60 years: in June 1961, the Kahl experimental nuclear power plant fed electricity generated by nuclear energy into the West German grid for the first time; five years later, the Rheinsberg nuclear power plant was the first commercially used nuclear power plant in the GDR. The six decades of nuclear power use were initially marked by euphoria, then increasingly by scepticism and rejection. This article, however, focuses less on social or political aspects than on (safety) technical aspects.

15 May 2023 | PSI

During the last decades, computing power has been subject to tremendous progress due to the shrinking of transistor size as predicted by Moore’s law. However, as we approach the physical limits of this scaling, alternative techniques have to be deployed to increase computing performance. In this regard, the next big advance is envisioned to be the usage of approximate computing hardware based on field-programmable gate arrays and/or digital-analogue in-memory circuits. Such approximate computing can provide disproportional gain (x1000) in energy efficiency and/or execution time for acceptable loss of simulation accuracy.

31 Mar 2023 | ETSON

HARMONISE project partners will have clustering activities with high-level Key Stakeholders, with the aim of mutual benefits.

31 Mar 2023 | VTT

The objectives of the research programme are to ensure that the authorities have sufficient expertise available in different situations, to develop nuclear safety competences and to perform high-quality scientific research.

31 Mar 2023 | SSTC NRS

The full-scale invasion of the russian federation troops into the territory of Ukraine caused many political, economic, social troubles and problems. In addition to the destroyed infrastructure and huge mined areas, Ukraine also faced a radiation threat. In addition to the more than 1 year ZNPP occupation, the territory of the exclusion zone and the zone of unconditional (obligatory) resettlement was captured for a month, looted and mutilated.

 

 

* The responsibility for the content of news provided by ETSON member organisation lies solely with the respective ETSON member. The views and opinions expressed in news content provided by ETSON member organisations do not necessarily reflect those of ETSON.

 

Stay informed - subscribe to our newsletter.

Stay informed - subscribe to our newsletter.
The subscriber's email address.